Office update
So far I've finished painting the window and trim Benjamin Moore Cloud White. I've also finished painting the frames on the top cabinets. I'm splitting the cabinet project into phases because I only have enough room in my basement to be painting one set of doors/drawers at a time. So right now I have all the doors for the top row of cabinets at home in various phases of painting (it is taking forever to finish them because of the drying time for the primer and paint and I don't want to flip them over until they are dry because I don't want to take the chance of messing up the paint job). I've also painted the back wall BM Hudson Bay, which will eventually cover all the walls. I am waiting to paint the other walls until I've painted the lower cabinets and removed the existing counter.
White window trim! |
The window before |
Here's the color on the back wall. It actually looks remarkably like the computer design our graphic artist did to get a sneak peak of what it might look like.
So here's the worklist for the office:
Paint windowPaint trimPaint upper cabinet frames- Paint upper cabinet doors (in process)
- Paint lower cabinet frames and doors/drawers
Disconnect sink- Remove counter
- Paint the rest of the walls
- Make fabric covered bulletin board "backsplash"
- Paint desk base
- Replace counter and desk top
- Gussy up the file cabinets
- Replace window blinds (this is new to the list; I've decided I need to get something that fits inside the window)
- Buy area rug
Labels: office
1 Comments:
I'm sure it's frustrating how slow your office project is going, but I know you know how worth it it will all be in the end. Good luck getting across the finish line! It's really getting there!
Post a Comment
Thank you for taking the time to comment! I appreciate it. I try to respond to comments here or sometimes via email so make sure to check back.
Subscribe to Post Comments [Atom]
<< Home